AIA A107 PDF

document from the AIA A Exhibit A. § Contractor, through its architect, engineers and consultants, is responsible for providing the. AIA Document A – TM Standard Form of Agreement Between Owner and Contractor for a Project of Limited Scope AGREEMENT made as of the. Fill aia a form aia instantly, download blank or editable online. Sign, fax and printable from PC, iPad, tablet or mobile. No software. Try Now!.

Author: Nabar Shakarisar
Country: Guatemala
Language: English (Spanish)
Genre: Health and Food
Published (Last): 14 September 2004
Pages: 242
PDF File Size: 12.3 Mb
ePub File Size: 20.96 Mb
ISBN: 434-9-95363-720-8
Downloads: 99123
Price: Free* [*Free Regsitration Required]
Uploader: Grolkis

During the one-year period for correction of Work, if the Owner fails to notify the Contractor and give the Contractor an opportunity to make the correction, the Owner waives the rights to require correction by the Contractor and to make a claim for breach of warranty. If the Contractor performs Work knowing it to be contrary to applicable Laws, the Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction.

If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.

Allowance amounts shall include the costs to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts. The Contract Documents shall not be construed to create a contractual relationship of any kind between any persons or entities other than the Owner and the Contractor. State the numbers or other identification of accepted alternates. The Contractor further warrants that the Work will conform to the requirements of the Contract Documents and will be free from defects.

Introduction to Construction Contracts and.

AIA A107 – 8-27 – Clean (01480188-2)

In addition to the requirements in section The Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters. Without limiting the foregoing, Contractor shall retain full responsibility for, and shall bear all costs associated with, any remediation of the site due to the presence of lead-based paint in any products to the extent remediation is requested by any governmental authority or by Owner, in its sole discretion.

  EXTECH MN16A PDF

Insert rate of interest agreed upon, wia any.

Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, and other similar materials. The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers shall not own or claim a copyright in the Instruments of Service. Number Portions of Addenda relating to bidding requirements are a1007 part of the Contract Documents unless the bidding requirements are enumerated in this Article 6.

Notwithstanding the foregoing, Contractor acknowledges and agrees that this Section If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work. The Owner, without invalidating the Contract, may order changes q107 the Work wia the general scope of the Contract consisting of additions, deletions or other revisions, with the Contract Sum and Contract Time being adjusted accordingly.

The Contract may be amended or modified only by a Modification. Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. Accordingly, no course of conduct or dealings between the parties, nor express or implied acceptance of alterations or additions to the Work and no claim that the Owner has a1007 unjustly enriched by any alteration or addition to the Work, whether or not there is in fact any such unjust enrichment, shall be the basis to any claim for an increase in the Contract Sum or change in the Contract Aoa.

All personal property belonging to Contractor shall be brought onto the Property at the risk of Contractor, and the Indemnified Parties shall not be liable for damage or destruction to or theft of any such personal property, except with respect to the gross negligence or willful aa of an Indemnified Party. The Work shall be in accordance with approved submittals.

All copies made under this authorization shall bear the copyright notice, if any, shown on the Instruments of Service.

Such obligation shall not be construed to negate, abridge, a1107 reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Section 9. Consent shall not be unreasonably withheld.

Upon such acceptance and consent of surety, if any, the Owner shall make payment of retainage applying to such Work or designated portion thereof. The policy must be primary and not excess of, or contributing with, any other insurance ais by or for the benefit of the Additional Insureds. The Contractor hereby specifically acknowledges and declares that the Contract Documents are sufficient to have enabled the Contractor to determine the cost of the Work therein in order to enter into the Contract and that the Drawings, Specifications, and all Addenda, a07 sufficient to enable it to construct the Work outlined therein.

  DL185 G5 QUICKSPECS PDF

The Contractor shall exercise the highest degree of care in the performance of the Work. Contractor agrees to pay any and all salary or other benefits to its employees and shall make all appropriate tax including unemployment taxsocial security, Medicare and other withholding deductions and payments. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all; performance by the Contractor shall be required to the extent consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results.

Notwithstanding anything to the contrary contained in the Contract Documents, the Owner may withhold any payment to the Contractor hereunder if and for so long as the Contractor fails to perform any of its obligations hereunder or otherwise is in default under any of the Contract Documents; provided, however, that any such holdback shall be limited to an amount sufficient in the reasonable opinion of the Owner to cure any such default or failure of performance by the Contractor.

If requested, the Contractor shall provide copies of all bids, bid letters, and executed subcontracts to Owner within ten 10 days after execution thereof.

AIA A – – Clean ()

Copyright Law and International Treaties. Unless otherwise provided, the Contractor shall make arrangements for such tests, inspections and approvals with an independent testing laboratory or entity acceptable to the Owner, or with the appropriate public authority, and shall, except as otherwise set forth below, bear all related costs of tests, inspections and approvals.

The Owner shall give such notice promptly after discovery of the condition. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.